Close
Super Terminal Expo 2026
Friday, September 4, 2026
LiGHT26

Lane starts digging massive tunnel in Seattle to store untreated stormwater

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Related stories

A Sector-by-Sector Look at the Industries Quietly Consuming the World’s Silver

The conversation about silver demand tends to operate at...

Sampyo Cement Expands AI Control at Samcheok Plant in South Korea

Sampyo Cement is expanding the use of artificial intelligence...

Foster + Partners Advances Robot Construction, SWIFT-Build

British studio Foster + Partners has joined an academic...
- Advertisement -

Lane Construction, a US subsidiary of Italy’s Webuild, has begun excavating a 4.2-km-long tunnel in Seattle, Washington state, that will collect and store untreated stormwater and sewage to prevent it from flowing into the city’s surrounding water.

In parts of Seattle, sewage and stormwater share pipes, and heavy rain causes around 276 million litres of untreated overflow enter the Lake Washington Ship Canal, Salmon Bay and Lake Union every year, harming wildlife.

The 5.5m-diameter tunnel running from Ballard in the west to Wallingford will be able to hold some 110 million litres until the water treatment plant is ready to process it, Webuild said.

Overflow will enter the tunnel through five vertical shafts at Ballard, East Ballard, Fremont, Queen Anne and Wallingford (Graphic courtesy of Seattle Public Utilities)

Overflow will enter the tunnel through five vertical shafts at Ballard, East Ballard, Fremont, Queen Anne and Wallingford. Since Queen Anne is on the other side of the ship canal, a smaller tunnel will be dug under the canal to convey its overflow to the main storage tunnel.

For the main tunnel, Lane will use a 5.5-metre-long tunnel boring machine that was named “MudHoney”, after one of Seattle’s famous grunge bands, in a public vote.

Among Lane’s other projects, there is a Caloosahatchee basin storage reservoir to reduce harmful discharges into an estuary in Florida, and the Three Rivers Protection & Overflow Reduction Tunnel (3RPORT) in Ft. Wayne, Indiana.

Top image: Lane will use a 5.5-metre-long tunnel boring machine that was named “MudHoney”, after one of Seattle’s famous grunge bands, in a public vote (Courtesy of Lane Construction)

Never miss a construction headline

The construction industry moves fast – stay on top of it with our must - read briefings.

  • The top construction and infrastructure stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global construction markets

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Latest stories

Related stories

A Sector-by-Sector Look at the Industries Quietly Consuming the World’s Silver

The conversation about silver demand tends to operate at...

Sampyo Cement Expands AI Control at Samcheok Plant in South Korea

Sampyo Cement is expanding the use of artificial intelligence...

Foster + Partners Advances Robot Construction, SWIFT-Build

British studio Foster + Partners has joined an academic...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »