Close
WORLD OF CONCRETE
Friday, December 12, 2025
JEC WORLD 2026

Doyon Utilities opens new first landfill-gas-to-energy project in Alaska

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

The UK Construction Sector Records Steepest decline Since Covid

The UK construction sector recorded its steepest contraction since...

Leasing heavy construction equipment provides relief during economic upheaval

Many businesses are feeling the effects of economic uncertainty:...

Is a whole-house solar generator a new energy project?

Whole-house solar generators have emerged as one of the...
- Advertisement -
Achema Middleeast

Doyon Utilities, LLC has opened a new first landfill-gas-to-energy (LFGTE) project in Alaska, which is powered by GE’s ecomagination-qualified Jenbacher gas engines.

Located on the Joint Base Elmendorf-Richardson in Anchorage, a joint US Army and Air Force base, the project will provide approximately half of JBER-Richardson’s 13MW of peak demand power.

According to Doyon Utilities CEO Dan Gavora said that beginning in 2013, federal agencies will be required to use renewable energy sources to provide at least 7.5% of total electric consumption.

Doyon will own and operate the facility and will buy the gas produced for at least the next 20 years, with an option for an extension to 40 years, under the agreement with the municipality.

According to military officials, the power produced will offset what the military would have to buy from the municipality, which will add up to more than $30 million in savings over the life of the project1.

The Anchorage Regional Landfill, which opened in 1987, has the capacity to hold 40 million cubic yards of waste. Currently one-third full, the landfill will likely reach capacity around 2045.

Western Energy Systems (WES), GE’s authorized distributor for Jenbacher gas engines in Alaska, provided the four Jenbacher J420 engine-generator sets and integrated these with balance of plant equipment required for the installation.

WES provided project management services for all equipment provided, performed commissioning services, and has opened a product support facility in Anchorage with technicians and parts inventory committed to support this project.

Achema Middleeast

Latest stories

Related stories

The UK Construction Sector Records Steepest decline Since Covid

The UK construction sector recorded its steepest contraction since...

Leasing heavy construction equipment provides relief during economic upheaval

Many businesses are feeling the effects of economic uncertainty:...

Is a whole-house solar generator a new energy project?

Whole-house solar generators have emerged as one of the...

The Future of Construction: Modular Technologies, Smart Homes, and Digital Twins

2035: How Your Children Will Build Picture this. Your son...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »