Close
Monday, March 10, 2025

Skanska JV awarded contract by Amtrak for East River Tunnel Rehabilitation Project in New York, NY

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

DOMOTEX ASIA/CHINAFLOOR 2025: Biggest flooring event returns

As "the year's largest dedicated gathering of the world's...

Leveraging Historical Project Data for More Accurate Construction Estimates

Accurate cost estimation is the key to any successful...

Who Sells the Best Trailer Axles Online? 7 Options for Industry Professionals

Construction professionals rely on trailers to transport equipment, materials...

Volcanic Ash Used for Radiation Shielding Concrete

A groundbreaking study led by Joel Maquiling, a Filipino...

Skanska, a leading global construction and development firm, and joint venture partner, E-J Electric Installation Co., announces it has been awarded a contract by Amtrak to lead the East River Tunnel Rehabilitation Project in New York, New York. The forthcoming upgrades will greatly improve safety, reliability, and modernize the 2.5-mile-long tunnels connecting New York Penn Station and Sunnyside Yard.

“We are honored to partner with Amtrak on yet another vital transportation project New York City to rehabilitate the East River Tunnel,” said Michael Viggiano, executive vice president of Skanska’s East Coast Civil operations. “In collaboration with E-J Electric Installation, we will work to reconstruct and modernize the tunnel infrastructure to achieve the highest measure of quality and safety and improve the travel experience for the thousands of commuters that pass through the tunnel on a daily basis.”

The project includes the rehabilitation of Line 1 and Line 2 of the East River Tunnels that were damaged by Superstorm Sandy, with the work on each consisting of the demolition of all tunnel components to the existing concrete tunnel liner, the repair of structural deficiencies of the tunnel concrete liner, and reconstruction of the bench walls and duct banks.

The project additionally includes the implementation of new traction power and overhead contact systems, signals, lighting, communication and fire-life safety systems, and replacement of the ballasted track with a direct fixation rail system and drainage system improvements. There will be no major service impacts to Amtrak, Long Island Rail Road (LIRR) or NJ Transit, all of which rely on this critically important tunnel.

Latest stories

Related stories

DOMOTEX ASIA/CHINAFLOOR 2025: Biggest flooring event returns

As "the year's largest dedicated gathering of the world's...

Leveraging Historical Project Data for More Accurate Construction Estimates

Accurate cost estimation is the key to any successful...

Who Sells the Best Trailer Axles Online? 7 Options for Industry Professionals

Construction professionals rely on trailers to transport equipment, materials...

Volcanic Ash Used for Radiation Shielding Concrete

A groundbreaking study led by Joel Maquiling, a Filipino...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back