The scope of work includes construction of several short roads in Riyadh. The total length of roads is 10 kilometers.
Client | Ministry of Transport
Actual Value: 1m USD
Contractors |
Main Contractor: Al Sair for Contracting
Country | Saudi Arabia
Category | Infrastructure
Project Type | Roads Construction
Project Duration |
From: Q3 2012 Actual
To: Q3 2014 Actual
Status | Construction
Scope | The scope of work includes construction of several short roads in Riyadh. The total length of roads is 10 kilometers.
Schedule | Al Sair for Contracting was awarded the main construction contract.