Close
Monday, April 28, 2025

Bailey gets hospital M&E package

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

2025 Construction Tariffs: Impact on U.S. Construction Industry

The reinstatement of extensive tariffs by President Donald Trump...

From Concept to Construction: The Lifecycle of a Curved Glass Facade

When it comes to any form of construction, the...

Where Can I Find the Most Affordable Rooftop Walkway Systems?

Rooftop walkways improve safety and protect roofing materials during...

AI & Agency Selection: Scaling Your Construction Business in the Digital Age

Look, the construction game's changing, and it's changing fast....

NG Bailey has won a £7m contract for mechanical and electrical (M&E) services on a hospital modernisation project in Sheffield. NG Bailey has been selected by principal contractor Simons Group as building services subcontractor for a £40m extension at Sheffield Children’s Hospital.

NG Bailey will be on site until August 2016, although all the corridor modules, risers and plant room services will be built offsite, before being transported in phases to Sheffield for installation. Maximising offsite work will enable the hospital to remain operational throughout the redevelopment work.

“This is another project where the benefits of offsite manufacture come to the fore,” said Andrew Morley, operations director for NG Bailey’s Engineering division. “These advantages do not solely centre on reducing costs and accelerating project delivery – they also act as a sustainable method of construction by reducing waste, lowering transport emissions and improving health and safety. It is a process which adds an extra dimension to our growing portfolio of NHS clients, who are turning to our Offsite Manufacture division in ever-increasing numbers.”

As part of the enabling works ahead of the main project, NG Bailey has already installed two new generators that supply the hospital estate with emergency power. The old generator and LV switchboard were removed and existing power cables were cut and diverted onto a new switchboard. The generator design was undertaken by NG Bailey via its specialist partner Wardpower Ltd.

The main project is a mix of new build and refurbishment of existing facilities, some of which date back as far as 1903. The main element is the creation of a three-storey wing that will become home to three existing wards.

Latest stories

Related stories

2025 Construction Tariffs: Impact on U.S. Construction Industry

The reinstatement of extensive tariffs by President Donald Trump...

From Concept to Construction: The Lifecycle of a Curved Glass Facade

When it comes to any form of construction, the...

Where Can I Find the Most Affordable Rooftop Walkway Systems?

Rooftop walkways improve safety and protect roofing materials during...

AI & Agency Selection: Scaling Your Construction Business in the Digital Age

Look, the construction game's changing, and it's changing fast....

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back