Close
Thursday, April 24, 2025

Glass ‘sky pool’ to connect tower blocks

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

How to Maintain Your Stone Cutter Blade for Longevity and Efficiency

If you have ever worked with dense materials like...

Comparing Leasing vs. Buying for Construction Equipment Needs

Which option do you prefer for your upcoming construction...

Trump Asks to Speed Up Processing Times for Infra Projects

As the White House goes on to overhaul the...

How Construction Firms Can Leverage Social Media for Talent Recruitment

Finding the right workers has always been a challenge...

Two London tower blocks are set to be connected at roof level by a swimming pool, 35 metres in the air, enabling residents to swim from the roof of one block to the next.

The suspended outdoor swimming pool in the sky is planned for Embassy Gardens – the residential heart of London’s newest neighbourhood at Nine Elms in Vauxhall.

The transparent ‘Sky Pool’ will link two residential buildings at the 10th storey. It will be 25 metres long and five metres wide. The structure, made of 200mm-thick glass, will be three metres deep with a water depth of 1.2 metres. It has been designed by Arup Associates, with specialist input from Eckersley O’Callaghan and aquarium designers Reynolds.

The pool is the vision of Sean Mulryan, chairman and CEO of Ballymore Group, co-developer of Embassy Gardens together with Eco World. Together they are developing the second phase as Eco World Ballymore.

The buildings linked by the pool are part of the second phase of the development which will be released to market in September, soon after the first residents have started to move in following the completion of phase one.

Latest stories

Related stories

How to Maintain Your Stone Cutter Blade for Longevity and Efficiency

If you have ever worked with dense materials like...

Comparing Leasing vs. Buying for Construction Equipment Needs

Which option do you prefer for your upcoming construction...

Trump Asks to Speed Up Processing Times for Infra Projects

As the White House goes on to overhaul the...

How Construction Firms Can Leverage Social Media for Talent Recruitment

Finding the right workers has always been a challenge...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back