Close
Super Terminal Expo 2026
Tuesday, July 28, 2026
LiGHT26

Streetworks contractor prosecuted after worker hit by bus

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

EU Launches Digital Product Passport Registry Targeting Material Traceability

The European Commission has officially launched the Digital Product...

SoftBank Explores $500M Acquisition of Gravis Robotics to Scale Autonomous Heavy Machinery

SoftBank Group is reportedly considering the acquisition of Gravis...

Saint-Gobain and CEPT University Join Hands for Sustainable Construction

Saint-Gobain and CEPT University have announced a long-term partnership...
- Advertisement -

A utilities contractor has been fined £12,000 after a worker was injured when clipped by a bus passing through its roadworks.

Rebeck Communications Ltd was employed to lay a pipe across Station Road in Long Bucky, Northamptonshire on the 14th May 2014.

Northampton magistrates heard that it is usual to have a maintained 500mm safety zone as a restricted area when undertaking this kind of work. The Health & Safety Executive (HSE) investigation found the road was 4.8 metres wide and was classified as ‘narrow lanes’.

Rebeck opted for a temporary traffic management system, allowing one lane to be closed and traffic passing on the remaining live lane.

However, during the reinstatement of the road surface at the centre point of the road, a worker was struck by a bus causing. He dislocated a knee and suffered severe ligament and muscle damage.

The court was told the half-metre safety zone was not being maintained and no other control measures were in place. It was suggested that the worker might have had to manoeuvre into the live traffic lane briefly to position some equipment as the bus was passing.

Rebeck Communications Ltd, of Eagle House, Billing Road, Northampton, pleaded guilty to breaching Regulation 26(2) of the Construction, Design and Management Regulations 2007 and was fined £12,000 and ordered to pay full costs of £1293.

 

Achema Middleeast

Never miss a construction headline

The construction industry moves fast – stay on top of it with our must - read briefings.

  • The top construction and infrastructure stories, straight to your inbox
  • The biggest news, features, interviews, and analysis
  • Dedicated coverage of the key developments shaping global construction markets

Latest stories

Related stories

EU Launches Digital Product Passport Registry Targeting Material Traceability

The European Commission has officially launched the Digital Product...

SoftBank Explores $500M Acquisition of Gravis Robotics to Scale Autonomous Heavy Machinery

SoftBank Group is reportedly considering the acquisition of Gravis...

Saint-Gobain and CEPT University Join Hands for Sustainable Construction

Saint-Gobain and CEPT University have announced a long-term partnership...

The Hidden Systems Driving Hospital Waste, and How to Fix Them

Hospitals are among the most complex building types, relying...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »