Close
Friday, April 4, 2025

Ambitious office development at King’s Cross takes next step with contractor appointment

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

How Strong Are Glulam Beams? A Comparison of Strength in Construction

In the world of construction, selecting the right structural...

Preventative Maintenance in Restaurant Plumbing: Essential Tips to Avoid Costly Emergencies

Running a restaurant demands flawless operations, and plumbing is...

Why Fire Protection Systems Fail and What Can Be Done About It

Fire protection systems are a normal part of architectural...

The spectacular transformation of King’s Cross led by the King’s Cross Central Limited Partnership (KCCLP) has taken yet another forwards step as KCCLP appoints BAM Construction in London to deliver 11-21 Canal Reach.

BAM, which recently completed the newest King’s Cross landmark, Coal Drops Yard, will now realise the Bennett Associates-designed suite of new buildings, aimed at achieving the lowest carbon high quality commercial office building in the UK.

The development includes two buildings providing BREEAM Outstanding office accommodation. When they are finished, Plots T2 and T3 will become known as 11-21 Canal Reach.

The building on plot T2 will be 12 storeys high at its highest point at the southern end of the site, stepping down to nine storeys towards the north. There will be impressive roof terraces with views across the city.

BAM is onsite already with a substantial enabling and substructure works package before the main scheme commences in earnest, with the expectation of completing early in 2021. Although the sums remain commercially confidential, it represents the largest contract signed by BAM Construct UK.

Construction Director Ewen Hunter, who has led for BAM on several of the buildings at King’s Cross, said: ‘Nothing at King’s Cross is ordinary. Every building is ambitious and the client is constantly pushing what can be achieved for itself and others. Our teams embrace the challenge and our integrated model, involving our design and engineering businesses, makes us an ideal fit for the scale and complexity of this big building with a demanding design.’

Planning for the T-Zone plots were granted by Camden Council in September 2016.

Read more: https://11-21canalreach.co.uk/

Latest stories

Related stories

How Strong Are Glulam Beams? A Comparison of Strength in Construction

In the world of construction, selecting the right structural...

Preventative Maintenance in Restaurant Plumbing: Essential Tips to Avoid Costly Emergencies

Running a restaurant demands flawless operations, and plumbing is...

Why Fire Protection Systems Fail and What Can Be Done About It

Fire protection systems are a normal part of architectural...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back