Close
Saturday, April 5, 2025

Flatiron JV wins $224M stretch of San Diegos North Coast Corridor

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

How Developers Can Use DSCR Metrics to Secure Better Construction Financing

Rising construction costs and fluctuating interest rates have narrowed...

The Environmental Impact of Replacement Windows in Modern Construction

Not many people understand the impact of the type...

How Strong Are Glulam Beams? A Comparison of Strength in Construction

In the world of construction, selecting the right structural...

Flatiron Construction Corp. recently announced that its joint venture with Skanska and Stacy and Witbeck as awarded a $224 million segment of the $6 billion, 40-year North Coast Corridor (NCC) project in San Diego County, California, bringing its total contract value for the project to $560 million.

As part of the new contract, which centers around high-occupancy vehicle (HOV) upgrades, FSSW will extend a carpool lane about eight miles on Interstate 5 between the cities of Encinitas and Carlsbad, according to Engineering News-Record. FSSW’s work will also include new auxiliary lanes; sound walls on private property; culvert upgrades; and the installation of CCTV cameras, fixed changeable message signs and fiber optics.

Work will be completed in two phases, with crews first widening the inside of the highway and then the outside of the highway. Crews will be protected by k-rail barriers along the entire length of the work area.

Other FSSW projects for the NCC initiative include a bridge-widening project with bike and pedestrian path improvements ($257 million); track and trestle rehab ($70 million); lagoon restoration ($117 million) and a 1.3-mile walking and biking path ($6.8 million). In all, the NCC project will see 27 miles of rail, highway, pedestrian, bike and environmental habit improvements during a 40-year program.

Flatiron’s name often pops up in association with major infrastructure projects. The company, along with NC-Lavelin, Dragados Canada and EBC Inc., is part of the design team for the CA$3.1 billion New Champlain Bridge in Montreal.

The Signature on the Saint Lawrence public-private partnership announced in November that the project is running about six months behind due to new bridge load limits and a one-month crane operator strike. The P3 faces up to $52 million in delay penalties if it can’t work out a compromise with the Canadian government.

Flatiron is also part of the $77 billion California bullet train project. The company, in a joint venture with Dragados, Jacobs Engineering Group and Sener, and under a $1.3 billion contract with the California High-Speed Rail Authority, is designing and building a 65-mile segment of rail between the California cities of Fresno and Allensworth through the Central Valley region of the state.

The scope of work includes construction of more than 60-grade separations, as well as viaducts, underpasses and overpasses. The joint venture is also responsible for bridges, culverts, drainage, trenches and tunnels and relocation of utilities, among many other rail, roadway and waterway tasks.

Latest stories

Related stories

How Developers Can Use DSCR Metrics to Secure Better Construction Financing

Rising construction costs and fluctuating interest rates have narrowed...

The Environmental Impact of Replacement Windows in Modern Construction

Not many people understand the impact of the type...

How Strong Are Glulam Beams? A Comparison of Strength in Construction

In the world of construction, selecting the right structural...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back