Close
Monday, February 24, 2025

Jacobs to work on $17bn California WaterFix project

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

– Leave Message for Us to Get Back

Related stories

Durability Meets Style: The Rise of Stone Flooring

Stone flooring has been a timeless choice in both...

3 Reasons You Should Start a Commercial Air-Duct Cleaning Business

New commercial buildings come up every day at an...

Ways to Ensure Your Construction Project Runs Smoothly

Starting a construction project is exciting, but it also...

The Role of Roofing in Sustainable Building Certifications: Achieving LEED and BREEAM Standards

Introduction Have you ever seen a modern skyline and noticed...

American technical services firm Jacobs Engineering has been selected by the Delta Conveyance Design and Construction Authority (DCA) for engineering design management (EDM) services pertaining to the $17bn California WaterFix programme.

WaterFix, the largest water conveyance project in California, has been designed to improve the reliability of the state’s water supplies, as well as protectand enhance the San Francisco Bay-Delta estuary.

Scheduled to begin in early 2019, the California WaterFix programme will include the refurbishment of outdated and unreliable water infrastructure that is more than 50 years old.

The old infrastructure is dependent on levees that put clean water supply at risk from earthquakes and sea-level rise.

Jacobs COO and president of buildings, infrastructure and advanced facilities Bob Pragada said: “WaterFix is one of the highest profile infrastructure projects in the nation, essential to secure clean water supplies for 27 million people, area businesses and three million acres of agricultural land.

“Building on our long-term relationship with California water agencies, DCA will tap into our extensive water infrastructure and engineering design experience to begin modernization of California’s water delivery system.”

The company’s initial $93m contract will support the preliminary and final engineering design phase of the 15-year programme.

Major infrastructure components include three water diversion intakes (3,000cfs each) with modern fish screens; two large tunnels (40ft diameter and 35 miles long); two large pumping stations (4,500cfs each); and new roads and utility relocations.

After more than a decade of studies, WaterFix has emerged as the most effective solution to California’s water shortages and improve environmental conditions in the Sacramento-San Joaquin Delta, including lessening the harmful effects of the existing infrastructure diversions near endangered fish habitats and reinstating natural river flows.

WaterFix project is expected to generate 122,000 jobs for the region and offer greater water security, as well as improved disaster preparedness and climate change resilience for California residents, businesses and agriculture that obtain their water from the Delta.

Latest stories