Tuesday, March 31, 2026
2026 Mining Türkiye Exhibitor List

Skanska JV awarded contract by Amtrak for East River Tunnel Rehabilitation Project in New York, NY

Note* - All images used are for editorial and illustrative purposes only and may not originate from the original news provider or associated company.

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Related stories

EU Sets Whole-Life Carbon Guidance for Construction Sector

The European Commission has published new guidance on “Life...

Sany Launches Hybrid Concrete Pump Truck with 1400km Range

Sany Heavy Industry has introduced what it describes as...

SHI and NEC Develop AI System to Improve Construction Safety

Sumitomo Heavy Industries (SHI) and NEC Corporation (NEC) have...
- Advertisement -

Skanska, a leading global construction and development firm, and joint venture partner, E-J Electric Installation Co., announces it has been awarded a contract by Amtrak to lead the East River Tunnel Rehabilitation Project in New York, New York. The forthcoming upgrades will greatly improve safety, reliability, and modernize the 2.5-mile-long tunnels connecting New York Penn Station and Sunnyside Yard.

“We are honored to partner with Amtrak on yet another vital transportation project New York City to rehabilitate the East River Tunnel,” said Michael Viggiano, executive vice president of Skanska’s East Coast Civil operations. “In collaboration with E-J Electric Installation, we will work to reconstruct and modernize the tunnel infrastructure to achieve the highest measure of quality and safety and improve the travel experience for the thousands of commuters that pass through the tunnel on a daily basis.”

The project includes the rehabilitation of Line 1 and Line 2 of the East River Tunnels that were damaged by Superstorm Sandy, with the work on each consisting of the demolition of all tunnel components to the existing concrete tunnel liner, the repair of structural deficiencies of the tunnel concrete liner, and reconstruction of the bench walls and duct banks.

The project additionally includes the implementation of new traction power and overhead contact systems, signals, lighting, communication and fire-life safety systems, and replacement of the ballasted track with a direct fixation rail system and drainage system improvements. There will be no major service impacts to Amtrak, Long Island Rail Road (LIRR) or NJ Transit, all of which rely on this critically important tunnel.

Achema Middleeast

Latest stories

Related stories

EU Sets Whole-Life Carbon Guidance for Construction Sector

The European Commission has published new guidance on “Life...

Sany Launches Hybrid Concrete Pump Truck with 1400km Range

Sany Heavy Industry has introduced what it describes as...

SHI and NEC Develop AI System to Improve Construction Safety

Sumitomo Heavy Industries (SHI) and NEC Corporation (NEC) have...

A Guide to Indoor Playgrounds for Amusement Parks

Today’s amusement parks have become all-season attractions for large...

Subscribe

- Never miss a story with notifications

- Gain full access to our premium content

- Browse free from any location or device.

Media Packs

Expand Your Reach With Our Customized Solutions Empowering Your Campaigns To Maximize Your Reach & Drive Real Results!

– Access the Media Pack Now

– Book a Conference Call

Leave Message for Us to Get Back

Translate »